NDA (if needed)
For sensitive programs, we can sign your NDA or provide ours before you share CAD and drawings.
ISO 9001 QMS • Inspection evidence • Export-ready delivery
Request a quote with the inputs that prevent delays and rework: drawings, models, CTQs, inspection needs, finishing, packaging, and ship‑to details.
Step-by-step RFQ
For sensitive programs, we can sign your NDA or provide ours before you share CAD and drawings.
Send 2D PDF and 3D STEP/IGES with revision level. If you have an assembly, include interface notes and critical features.
Provide grade/condition and finish standard (anodize/passivation/plating/coating). If flexible, we can recommend options.
Prototype vs production, target ship date, and any ramp plans. This impacts routing, fixture approach, and pricing.
Specify CoC, material certs (MTR), dimensional reports, and first-article package requirements. Also note any customer-specific formats.
Labeling rules, serial/lot traceability, kitting BOMs, and surface protection requirements. Provide ship-to and incoterms if applicable.
A quote is only useful if it is built on the same assumptions your receiving and engineering teams will use later. After we receive your package, SEMIX runs a structured review so the quote reflects reality—material availability, process route, inspection plan, and finishing boundaries.
RFQ form template
Tell us what you need and attach drawings/models. We typically reply within 1 business day with questions and a quote timeline. If the upload is larger than 25MB, you can also email sales@semix.vn with a link (Google Drive/Dropbox).
| Priority | What to include | Why it matters |
|---|---|---|
| Must | 3D model (STEP/Parasolid) and/or 2D drawing with revision clearly identified | Locks geometry and prevents quoting the wrong revision—one of the most common global supply chain failure modes. |
| Must | Material spec: grade/condition (e.g., Al 6061‑T6, SS 304, Ti‑6Al‑4V) and any compliance notes | Material condition changes machinability, distortion risk, and achievable finish/tolerance. |
| Must | Quantity + program stage (prototype / pilot / production) and target delivery date | Drives route decisions, setup amortization, and inspection depth. |
| Should | CTQs called out (features that drive fit/function), plus mating conditions if relevant | Focuses process and inspection planning on the characteristics that matter most. |
| Should | Finish requirements (anodize/passivation/plating/coating) and cosmetic expectations | Finishing boundaries affect lead time, cost, and acceptance criteria at receiving. |
| Should | Inspection/reporting needs (CMM report, sampling plan, first‑article layout) | Prevents approval delays and rework caused by missing evidence. |
| Optional | Packaging/kitting instructions, labeling, part marking, and ship-to consolidation needs | Reduces internal touch time and accelerates receiving/assembly. |
| Optional | Target cost / alternates you will accept (material, finish, tolerance relaxations) | Lets us propose options that improve lead time and total landed cost. |
If your design is sensitive, request an NDA before sharing detailed CAD. We can start with a high-level summary (part family, material, size envelope, quantity) while the NDA is in progress, then finalize the quote once the full package is received.
If you prefer email over the form, use a simple structure so your team and ours can review quickly.
Subject: RFQ – [Part Name / Part Number] – [Qty] – [Material] – [Need-by Date] Hello SEMIX team, Please quote the attached part(s). Summary: - Part number / name: - Revision: - Quantity (prototype / pilot / production): - Material grade/condition: - Finish/special processes: - Key CTQs (features that drive fit/function): - Inspection/reporting required (CMM? layout? key characteristics?): - Packaging/kitting/labeling requirements: - Ship-to country / city: Files attached: - 3D model (STEP/Parasolid) - 2D drawing (PDF) - Any templates/spec flow-down If an NDA is required, please send your NDA process first. Thank you, [Name / Company / Phone]
Early-stage projects often start with partial information. You can still get a useful budgetary quote if you provide:
Once the drawing is released, we convert the budgetary quote into a production quote through contract review and inspection planning.
Lead time is usually the sum of the slowest steps, not the average. Understanding the critical path helps you decide where to spend time (engineering clarification) and where to reduce risk (material availability, finishing boundaries, inspection scope).
| Step | Why it becomes the bottleneck | How to reduce risk |
|---|---|---|
| Material procurement | Certified material and specific conditions can have long lead times | Confirm alternates early; include acceptable equivalents if possible |
| Finishing | External queues and unclear acceptance criteria cause delays | Define standard/spec and masking rules; avoid late changes |
| Engineering clarifications | Unclear CTQs or missing revisions trigger re-quotes | Use the RFQ checklist; call out CTQs; confirm revision control |
| Inspection & approval packages | Tight GD&T and first-article evidence requires planning and time | Agree on inspection level and method during RFQ |
| Packaging / kitting | Complex labeling, kitting, and consolidation adds touch time | Provide clear packing instructions; standardize labeling |
Helpful resources
Exactly what to send to get an accurate quote faster.
Design rules that reduce machining risk and cost.
What to include for receiving and approvals.
Capture drawings/models, material/finish boundaries, documentation needs, packaging, and dates—so quotes are accurate the first time.
Make assumptions explicit to prevent re-quote surprises and align scope with buyer expectations.
Standard forms for travelers, inspection plans, CoC, traceability, NCR/CAPA, packaging checklists, and process changes.